PROJECTS REALIZED

ZAKOPYANKA GALLERY (POLAND)

Excavation with hammer and explosive, pre-coating, final concrete casting of the natural tunnel called "Mala Lubien" for a total length of approximately 4,000 ml (n. 2 pipes of 2,000 ml) with an average section of 170 m2 about.

Main client : State Treasury

Trustee : Astaldi

Screenshot 2023-10-25 alle 17.43.53.png
Screenshot 2023-10-25 alle 17.47.00.png

MARANA GALLERY

Execution of traditional excavation activities, construction of works to consolidate the excavation face by means of metal threads and VTR pipes, execution of swellex type bolts, pre-coating consisting of ribs and spritz beton and realization of waterproofing, laying in the work of shaped steel and metal reinforcements, construction of the final coating castings.

 

Principal Client: ANAS

Contractor : TOTO SPA

 

ZAKOPYANKA GALLERY (POLAND)

Excavation with hammer and explosive, pre-coating, final concrete casting of the natural tunnel called "Mala Lubien" for a total length of approximately 4,000 ml (n. 2 pipes of 2,000 ml) with an average section of 170 m2 about.

Main client : State Treasury

Trustee : Astaldi

53645.jpg
gr.jpeg

MARANA GALLERY

Execution of traditional excavation activities, construction of works to consolidate the excavation face by means of metal threads and VTR pipes, execution of swellex type bolts, pre-coating consisting of ribs and spritz beton and realization of waterproofing, laying in the work of shaped steel and metal reinforcements, construction of the final coating castings.

 

Principal Client: ANAS

Contractor : TOTO SPA

 

CASTAGNOLA GALLERY

Execution of the pre-consolidation of the excavation faces with VTR and threading, realization of the advance excavation (including niches and bypass) with loading and transport of the Smarino material,

laying of the pre-covering with ribs and spritz beton chosen of the backward arches and walls.

Principal Client: Cociv Consortium

Contractor: Giovi tunnel consortium

05_cop2_04_l.jpg
IMG_1268.JPG

CROSS OF CALLE GALLERY

Realization of the excavation activities from two entrances, through mechanical demolition and consolidation works of the tunnel, consisting of metal inserts and nails in resin glass.

 

Main Client : Quadrilatero Marche Umbria SpA

Contractor : Astaldi

MORMANNO GALLERY

Construction of the Mormanno Gallery: excavation with explosives, consolidation works on the front, installation of ribs and final coating.

Main Client: A3 motorway (Anas)

160512493-32ab8832-2ab6-4650-abf1-875c03
entree_tunnel_du_frejus.jpg

FREJUS TUNNEL (ITALIAN SIDE)

Construction of the Lotto 2 Lato Italia safety tunnel

Underground execution of holes for micropiles, excavation, installation of metal belts, execution of the final coating, foundation work, cutting, anchoring, execution of by-passes and niches.

Main Client : SITAF SpA

Contractor: Tunnel Fréjus SCARL

EURO-ALPIN LYON-TURIN (TELT) TUNNEL

Dismantling and transport of concrete off site.

Main Client : TELT

Contractor : SPIE BATIGNOLLES / GHELLA + RAZEL BEC / PIZZAROTTI

222759666-4c2e8534-38a1-40e2-8b84-9d1951
Schermata 2020-06-05 alle 11.36.33.png

TANGENTIAL CONNECTION GALLERY NAPLES - PORT OF POZZUOLI

Excavation, consolidation and coating works.

 

Main Client : COPIN DUE SPA

Contractor : SABESA SPA